Clothing Manufacturing RFQ Template: Request a Comparable Factory Quote
Clothing Manufacturing RFQ Template for Fashion Brands
Quick answer: A request for quotation (RFQ) is the brief you send to a clothing manufacturer so it can price a defined garment and production quantity. An effective RFQ lists the product specification, size-and-colour quantities, sampling scope, packaging, inspection criteria, target dates and commercial delivery terms. The more consistently you describe the same requirements to each supplier, the more meaningful the comparison.
Copy-ready clothing manufacturing RFQ
Use this checklist as a starting brief. Replace every placeholder with the actual information for your collection; leave unknown requirements marked as questions instead of inventing figures.
| RFQ field | Information to provide |
|---|---|
| Buyer and contact | Legal business name, contact person, email and destination market |
| Product and style ID | Example: women’s occasion dress, internal code DRS-01 |
| Design reference | Tech pack, sketches, measurement chart or approved physical sample |
| Fabric and trims | Composition, weight if relevant, finish, lining, closures and decoration |
| Size range and grading | Base size, finished measurements and grading or size-by-size chart |
| Colour/quantity matrix | Target units per style, colour and size; indicate which variations are optional |
| Branding | Neck label, care/composition label, hang tag, barcode and packaging needs |
| Sample stages | Fit, pre-production and other required approvals, with reference documents |
| Quality control | Agreed tolerances, key inspection points, reporting and defect handling |
| Timing and shipment | Sample target, desired shipment window, destination, proposed Incoterms® rule |
| Quote breakdown | Sample cost, bulk unit cost, MOQ, setup charges, packaging, freight if applicable |
Short RFQ message to send to a factory
We are requesting a quotation for a women’s apparel collection. Please review our attached style references and measurement chart. Our initial target is [quantity] units across [number] styles and [colours]. Please confirm the recommended sampling process, MOQ per style/colour, available materials, what is included in your unit price, estimated production lead time after approval, packaging options and the information you still require. Our target destination is [country/city], and we would like the proposed shipping terms stated separately.
How to compare two clothing quotes fairly
- Confirm the same product: identical fabric specification, construction, lining, embellishment, size range and packaging requirements.
- Clarify quote scope: sample fees, development work, bulk production, labels, packing, inspection and inland transport.
- Separate quantity assumptions: unit price for 50 pieces can differ from pricing for 500; request price breaks only for realistic quantities.
- Check schedule assumptions: material procurement, sample revisions and production start conditions.
- Define delivery terms: an EXW quote should not be directly compared with a DDP quote without adjusting the freight, duty and customs obligations.
- Confirm changes in writing: keep one approved version of the garment specification and quote for each order.
Illustrative landed-cost comparison
A hypothetical production offer of $12 per garment does not necessarily mean the finished inventory costs $12 per garment when delivered to your business. The buyer may also need to budget for samples, custom labeling, packing, freight, insurance, customs charges, taxes and inspection. These are planning categories, not BG Clothing prices or guaranteed customs costs.
What a manufacturer needs to calculate MOQ
MOQ depends on fabric supplier minimums, colour-specific purchases, setup requirements, garment complexity, trims and agreed branding. Send an honest initial demand forecast and ask which changes—fewer colours, available fabrics or simpler trims—would affect feasibility. See the clothing MOQ guide.
Common RFQ mistakes
- Requesting a guaranteed unit price using only a reference photograph
- Leaving size ratios, fabric composition or label design undecided
- Confusing an approved fit sample with a production-ready sample
- Comparing quotes that allocate shipping and import duties differently
- Using an old quotation after material or design requirements change
Frequently asked questions
Can I request a clothing quote without a tech pack?
Yes, a manufacturer may discuss feasibility from photographs and sketches, but reliable pricing and bulk approval generally need more complete measurements, materials, construction details and quantity assumptions.
Is sample cost included in bulk manufacturing?
Not necessarily. Ask whether prototype, revisions and any pre-production samples are separately charged and under what conditions costs may be credited.
Does the cheapest quote always lead to the lowest import cost?
No. Compare the full specified product, inspection and logistics scope, including who pays freight and destination charges.
Is an RFQ the same as a purchase order?
No. An RFQ requests price and feasibility. The purchase order and supporting agreements should document the final commercial and technical commitments.
Further resources
Use our tech pack checklist, sample-stage comparison, pre-order checklist and Incoterms guide. Send BG Clothing your RFQ with style references, quantities and destination.
About this resource: Educational buyer template, not an offer of fixed pricing or legal advice. Confirm actual manufacturing capacity, specification, timelines and terms for your order.